Start with the purpose of the run
A pilot for evaluating a formula is a different assignment from a finished product launch. One may focus on samples and specifications. The other also needs approved packaging, a defined pack-out, and a plan for finished goods. Tell your manufacturer which outcome you need before comparing minimums.
At CraftCo in Holland, Michigan, low-to-no MOQ flexibility is evaluated for qualifying pilots and smaller launches. That does not mean every beverage, package, or process can run at any quantity. We confirm technical fit and applicable minimums for the actual project.
Production minimums and purchasing minimums are different
The quantity a filling line can accommodate may differ from the quantity available from an ingredient or packaging supplier. A small finished run can still leave unused cans, closures, labels, or ingredients. Those materials affect your cash commitment and storage plan even when they are not all consumed during filling.
- Ask for the finished-unit minimum and the component purchasing minimums separately.
- Confirm who buys each item and who owns unused materials.
- Ask how leftover liquid, components, storage, and shipment will be handled.
Ask whether the minimum applies per SKU
A total order spread across several flavors is not necessarily equivalent to one product at the same total volume. Different liquids, labels, and package configurations can add separate preparation and changeover work. Ask whether the quoted minimum applies to the overall project, each formula, or each packaged SKU.
For an early launch, discuss whether a more focused first assortment could meet your goals. That is a planning conversation, not a guarantee that reducing SKU count will make every small run feasible.
Package and process choices matter
Bottle shape, closure, label application, can format, carbonation, and the product’s processing and shelf-life needs all influence fit. A package that looks standard in a design mockup still needs a compatibility review before you order it.
CraftCo’s existing formats include 12 and 16 oz standard cans, 12 oz sleek cans, and glass from 50–750 mL plus 1 L and 1.75 L. Exact specifications and tooling are confirmed by project. Qualifying non-alcoholic concepts also require a technical review; a listed can size alone does not establish that a beverage can be manufactured here.
Compare the whole first-run commitment
When comparing proposals, use the same formula status, package, SKU count, volume, and responsibilities. Separate development, materials, production, testing, packing, and any storage or logistics arrangements that apply. A lower unit count is not automatically a lower total commitment.
Bring your target quantity, the purpose of the run, formula readiness, package direction, and launch timing. If a detail is unknown, say so. A useful first conversation identifies the decisions still needed instead of turning an early estimate into a production promise.
THE PRACTICAL TAKEAWAY
Ask for a project-specific minimum with clear component commitments. CraftCo’s flexibility is reviewed against your liquid, process, and package, rather than a universal unit count.
Bring us your next beverage.
Tell us what you’re making. Minimums, development work, and production fit are confirmed by project.
Discuss your first production run